{
  "is": "issue",
  "title": "Minimal IT operations due to power shutdown",
  "body": "\u003cp\u003eDue to the announced (second) power outage by Stadtwerke München in buildings B, E, R, and X, university-wide IT operations will once again be significantly restricted\u003c/p\u003e\n\u003cp\u003efrom Tuesday, 29.09.26 at 15:00 until Wednesday, 30.09.26 at approximately 16:00.\u003c/p\u003e\n\u003cp\u003eMinimal operation includes the following services:\u003c/p\u003e\n\u003cul\u003e\n\u003cli\u003eAuthentication with university account \u0026amp; MFA (and thus access to external services such as Zoom, Outlook, BayernCollab \u0026amp; OneDrive)\u003c/li\u003e\n\u003cli\u003eTelephony via UCware\u003c/li\u003e\n\u003cli\u003eDoor access with Salto (via token)\u003c/li\u003e\n\u003cli\u003eDHCP and DNS\u003c/li\u003e\n\u003cli\u003eeduVPN\u003c/li\u003e\n\u003cli\u003eDesigo\u003c/li\u003e\n\u003cli\u003ePrimuss\u003c/li\u003e\n\u003c/ul\u003e\n\u003cp\u003eNote: During the outage periods, no IT operations at all will be possible in buildings B, E, R, and X (not even minimal operation). If you have questions about the power outage itself, please contact Building Management.\u003c/p\u003e\n",
  "createdAt": "2026-09-11 14:10:00 +0200 +0200",
  "lastMod": "2026-09-11 12:19:59 +0000 UTC",
  "permalink": "https://status.hm.edu/en/issues/2026-09-11-it-minimalbetrieb-aufgrund-von-stromabschaltung/",
  "severity": "<no value>",
  "resolved": false,
  "informational": true,
  "resolvedAt": "<no value>",
  "affected": ["Bay.FIS", "FAMOS", "FormCycle", "HAWKI", "HM PKI", "Jira", "LimeSurvey", "Mahara", "Matomo", "Matrix", "Moodle-P", "Moodle", "Proxmox", "WLAN – eduroam"],
  "filename": "2026-09-11-it-minimalbetrieb-aufgrund-von-stromabschaltung.md"
}