{
  "is": "issue",
  "title": "Minimal IT operations due to a power shutdown",
  "body": "\u003cp\u003eHM IT is currently operating in minimal IT mode due to the planned power shutdown by Stadtwerke München during the period\u003c/p\u003e\n\u003cp\u003efrom Wednesday, 05.08.26 at 4 p.m. to Thursday, 06.08.26 at approx. 3 p.m.\u003c/p\u003e\n\u003cp\u003eMinimal operation includes the following services:\u003c/p\u003e\n\u003cul\u003e\n\u003cli\u003eAuthentication with university account \u0026amp; MFA (and thus access to external services such as Zoom, Outlook, BayernCollab \u0026amp; OneDrive)\u003c/li\u003e\n\u003cli\u003eTelephony with UCware\u003c/li\u003e\n\u003cli\u003eDoor access with Salto (via token) and Zeus\u003c/li\u003e\n\u003cli\u003eDHCP and DNS\u003c/li\u003e\n\u003cli\u003eeduVPN\u003c/li\u003e\n\u003cli\u003eDesigo\u003c/li\u003e\n\u003cli\u003ePrimuss\u003c/li\u003e\n\u003c/ul\u003e\n\u003cp\u003eNote: During the power-off times, no IT operations will be possible at all in buildings B, E, R, and X (not even minimal operations).\u003c/p\u003e\n\u003cp\u003eAt the end of September, the same restrictions will occur again. We will inform you again once the exact period has been set.\u003c/p\u003e\n",
  "createdAt": "2026-08-05 16:00:00 +0200 +0200",
  "lastMod": "2026-08-06 15:37:28 +0000 UTC",
  "permalink": "https://status.hm.edu/en/issues/2026-08-05-it-minimalbetrieb-aufgrund-von-stromabschaltung/",
  "severity": "down",
  "resolved": true,
  "informational": false,
  "resolvedAt": "2026-08-06T15:20:00+02:00",
  "affected": ["Bay.FIS", "Big Blue Button", "CMS First Spirit", "eduVPN", "FAMOS", "FormCycle", "IDM", "Jira", "Streaming", "LimeSurvey", "Moodle-P", "Matrix", "Moodle", "Mahara", "HAWKI", "Matomo", "Proxmox"],
  "filename": "2026-08-05-it-minimalbetrieb-aufgrund-von-stromabschaltung.md"
}